| Key data | |
| District | Hellerberge |
| Length of target network 2045 | 0.7 km |
| Heat demand 2045 in the area | 16.5 GWh/a |
| Heat load 2045 in the area | 15.1 MW |
| Potential energy sources for heat generation |
|


| Existing buildings (values based on the heat register of the state capital Dresden) | |||
|---|---|---|---|
| Energy reference area | 257.230 m² | Number of buildings | 42 |
| of which residential | 35.260 m² | Number of residential units | 350 |
| of which commercial/industrial/public | 221.970 m² | Proportion of listed buildings | 1% |
Current structure in the neighbourhood

Anteil Energieträger am Endenergiebedarf

Anteil Energieträger am Endenergiebedarf

Verteilung Baualtersklassen (Anteile an EBF)

Verteilung Baualtersklassen (Anteile an EBF)

Verteilung Heizungsalter (Anteile an EBF)

Verteilung Heizungsalter (Anteile an EBF)

Eigentumsverhältnisse (Anteile an EBF)

Eigentumsverhältnisse (Anteile an EBF)
GHD = trade, commerce, services
EBF = Energy reference area
WP = heat pump
Detailed information
| Development of heat demand and emissions | Stock | 2045¹ |
|---|---|---|
| Final energy demand incl. environmental heat (GWh/a) | 22,0 | 16,7 |
| specific final energy requirement (kWh/m²a) | 85 | 65 |
| Greenhouse gas emissions (tCO2eq/a) | 5.390 | 224 |
| Heating network | |||
|---|---|---|---|
| Total investment framework | eUR 8.91 million | BEW subsidy (40%) | eUR 3.57 million |
| of which distribution grid | eUR 1.44 million | of which distribution grid | eUR 0.57 million |
| of which heat generation³ | eUR 7.48 million | of which heat generation | eUR 2.99 million |
¹) Assumption: Local heating connection rate 75% and 25% decentralised air-to-water heat pumps
³) Assumption: air-to-water heat pump 1.9 MWth, peak load boiler 2.3 MWth, heat storage tank 5 MWh





Wärmenetzgebiet und grobe Trassenlage

Wärmenetzgebiet und grobe Trassenlage

Eigentumsverhältnisse unbebaute Flächen ²

Eigentumsverhältnisse unbebaute Flächen ²
²) Developed area <5%
| Period | ||
|---|---|---|
| In-depth implementation review SachsenEnergie |
| 2027-2028 |
| Planning and securing land |
| 2029-2034 |
| Realisation |
| 2035 - 2037 |