  • Heating network (existing)
    Existing, already active District or Local heating networks. Connection to the respective network is the recommended heating solution here.
  • District heating network expansion by 2030
    Planned expansion of the central district heating network by 2030. Buildings in these areas should be connected to the district heating network as a priority.
  • District heating network expansionby 2035
    Planned expansion of the central district heating network by 2035. Connection recommendation analogous to the expansion areas by 2030.
  • Test area
    In principle, all heat supply area types are still open. Areas are defined in terms of the main areas to be tested and prioritisation in terms of time
  • District heating network test area
    Areas in which it will be examined by 2028 whether an economic expansion of the district heating network is possible. Those affected can obtain information on the current status from SachsenEnergie AG.
  • Local heating network test area
    Areas with potential for new local heating networks that will be analysed in feasibility studies by 2028. Expressions of interest for a connection are recorded via the digital energy pilot.
  • Decentralised heat supply
    Areas with low heat density in which individual building solutions (e.g. heat pumps, solar thermal) are more economical. Neighbourhood networks or a later hydrogen supply are also being examined here.