Fact:
In most cases, connecting a heat pump is straightforward and the grid operator is obliged to provide the connection. However, it is important to comply with the notification requirement: every heat pump must be registered with the relevant grid operator prior to installation. This is usually handled by the specialist contractor you have commissioned. As part of the registration process, the electricity network operators check the existing network capacity and can plan any necessary adjustments in good time. The expansion of the electricity networks is already underway in anticipation of the increasing electrification of heating and transport. You can find the network expansion plan for Dresden and Eastern Saxony by SachsenNetze GmbH here.
A lack of connection is therefore the exception rather than the rule. Technical feasibility should always be assessed on a case-by-case basis.